Saturday, July 16, 2011
ALMOST FINISHED!
Last Saturday we laid the bricks for the hearth floor (which is where the
cooking will happen) then we started building the sand mound.
Then we rebuilt it this Saturday because
a sand mound cannot stay the same in storms and lots of heat...
We then covered it in wet paper so it will be easier to take out, and much
slower than planned built up the first layer of our wall. In a few days it will be
ready to have its first firing!
Monday, June 20, 2011
the walls are built. now on to insulation
Tuesday, June 14, 2011
a few more hours on the earth oven
Tuesday, June 7, 2011
Moving right along
Friday, June 3, 2011
I've decided to start posting again.
I have started a new project. It is called an earth oven and so far it has consisted of a lot of digging. This involved hitting a gas line (not breaking it), hurting my toe, terrible back pains, 100lbs of rocks, and 6 hours of work.... AND IT'S ONLY TWO FT DEEP!!!!!! The part that is being dug is about 5x5 and it needs to be 3 ft. Anyways hopefully the digging will be done by tomorrow and the building can begin.
The first picture is the site before the digging, the second shows Champ helping me out, and the third picture is an example of a finished earth oven.
The first picture is the site before the digging, the second shows Champ helping me out, and the third picture is an example of a finished earth oven.